Followers

Saturday, December 1, 2012

Misteri Tumbang Kerajaan Pakatan Rakyat Perak Terbongkar Posted by Addin


Mohamad Nizar Jamaluddin merupakan Menteri Besar yang paling singkat dalam sejarah kerajaan Perak.Nizar naik dalam jangka waktu yang paling singkat, dan jatuh dalam masa yang paling singkat juga.

Tak ramai yang mengenali Nizar sebelum dia menjadi Menteri Besar.Dalam pilihanraya umum ke-11, Nizar bertanding di Parlimen Kuala Kangsar, Bandar Diraja, tetapi tewas. 

Pada pilihanraya umum ke-12 tahun 2008 lalu, dia bertanding di DUN Pasir Panjang dan menang dan seterusnya dipilih untuk menjadi Menteri Besar Perak.

Liku-liku pemerintahan Nizar di Perak penuh dengan dugaan. Dan dugaan yang paling besar bukannya datang dari Umno dan Barisan Nasional (BN) tetapi dari Sultan Azlan Shah. 

Seperti yang pernah disiarkan di dalam Malaysia Today, semuanya berkaitan dengan ketamakan harta kekayaan.

Was the Sultan of Perak blackmailed? PDF Print
Posted by admin   
Monday, 09 February 2009 10:51
On 3rd July and 11th August 2008, DATUK KONG HONG MING made two separate reports to the Anti-Corruption Agency in Kota Kinabalu with regards to alleged corruption in the awarding of the ‘Jalan Sapulut – Kalabakan, Tawau’ road project at the contract sum of RM565 million. The sub-contract was awarded to Gamuda Berhad , a company owned by Raja Datuk Seri Eleena Raja Azlan Shah. Thus far no action has been taken by the Anti-Corruption Agency. Was this used to blackmail the Sultan of Perak?

Further reading:
Perak, PR, BN and Gamuda - It’s all about Business, Stupid
Construction New Road Project From Sapulut to Kalabakan, Sabah To:   

The Director / Officer In-Charge
Anti-Corruption Agency (ACA)
Tawau


Dear Sir,

Re: AN ACA REPORT – Request for Investigation of Any Corrupt Practices and Abuse of Power on the Construction of ‘Jalan Sapulut – Kalabakan, Tawau, Sabah’ as a Design & Build Contract at the Contract Sum of RM565 million 

I, DATUK KONG HONG MING (NRIC NO.530306-12-5323), a Malaysian of Lot 21, 3rd Floor, Block C, Damai Point, Luyang, Kota Kinabalu (Hand-phone 0138888188 and 088-233558) hereby make this report calling upon ACA to investigate any corrupt practices or abuse of power committed in the implementation of a road construction project by the Federal Government through Jabatan Kerja Raya.

The subject matter of this complaint is a Design & Build contract for a road project described as ‘Jalan Sapulut – Kalabakan, Tawau’ at the contract sum of RM565 million. The design for the road project at the contract sum of RM565 Million for 179 kilometer was a permanent bituminous road with sealed pavement.

The contractual obligations of the contractor in a Design & Build contract require the contractor to provide the design, scope of work and specifications to be approved by the Government and to build according to the approved design, scope of work and specifications. Thereafter, based on negotiation between the Government and the contractor, the Government awarded the Design & Build contract at the negotiated contract sum, in this case, RM565 million for 179 kilometer of sealed road with bituminous pavement.

In a Design & Build contract like this contract, the contractor is not permitted to amend or vary the design and scope of work. In a nutshell, the contractor must complete the contract in full conformity with the approved design and scope of work without variation order.

The Project was completed sometime in early 2008 and the contractor has demobilized from the site recently.

Unfortunately, instead of building 179 kilometer of bituminous pavement serving as a major truck road linking the south and north of the State of Sabah, the Government has only completed only a 179 kilometer of standard gravel road wholly contrary to the Design & Build contract for a bituminous sealed road.

Before the Design & Build contract, the existing road was already then a good gravel road built and used by timber operator for logging activities.

I also urge your ACA experts to investigate into the very sub-standard and extremely poor quality of work done and workmanship carried out in this mega project costing our Malaysians taxpayers some RM565 million. It is just too plain and obvious in inspecting the newly completed retaining structures and concrete roadside drains which are already now in such deplorable conditions. 

It is a crime to allow such shoddy workmanship and inferior work in this expensive project. What was the basis for the Government to accept the road as practically and satisfactorily completed?  

This is a case of an outrageous and scandalous wrongdoing. It is more than just a serious wastage and abuse of public funds. It has also deprived all Malaysians especially Sabahans in Tawau a good system of road network in furtherance of our social and economic development. 

Those who were responsible for the suffering of the people must be held accountable for this tragic loss of public funds and blatant abuse of power.  
It will be more outrageous for us, especially the ACA, to ignore it.   

Thank you for your attention and further necessary actions against those culprits who were responsible for any corrupt practices and abuse of power.
Yours faithfully,


__________________________
DATUK KONG HONG MING
Dated: 3rd July 2008

***************************************************************
11th August 2008
To:   
The Director
Anti-Corruption Agency (ACA)
Kota Kinabalu

Dear Madam,


Re: AN ACA REPORT – Request for Investigation of Any Corrupt Practices and Abuse of Power on the Construction of ‘Jalan Sapulut – Kalabakan, Tawau, Sabah’ as a Design & Build Contract at the Contract Sum of RM565 million 

I, KONG HONG MING (NRIC NO.530306-12-5323), a Malaysian of Lot 21, 3rd Floor, Block C, Damai Point, Luyang, Kota Kinabalu (Hand-phone 0138888188 and 088-233558) hereby make this report calling upon ACA to investigate any corrupt practices or abuse of power committed in the implementation of a road construction project by the Federal Government through Jabatan Kerja Raya.

On 03.07.2008, I lodged this complaint at the ACA office in Tawau. I provided some documents for the purpose of investigation. However, I am uncertain whether any investigation has been carried out. I must congratulate you that your ACA officers in Tawau were courteous and professional to complainant at least to me during two occasions. But, I was surprised that in another occasion while I was there, a male staff was not so happy to accept my report on other matter.         

The subject matter of this complaint is a Design & Build contract for a road project described as ‘Jalan Sapulut – Kalabakan, Tawau’ at the contract sum of RM565 Million. The design for the road project at the contract sum of RM565 Million for 179 kilometer was a permanent bituminous road with sealed pavement. 

The contractual obligations of the contractor in a Design & Build contract require the contractor to provide the design, scope of work and specifications to be approved by the Government and to build according to the approved design, scope of work and specifications. Thereafter, based on negotiation between the Government and the contractor, the Government awarded the Design & Build contract at the negotiated contract sum, in this case, RM565 million for 179 kilometer of sealed road with bituminous pavement. 

In a Design & Build contract like this contract, the contractor is not permitted to amend or vary the design and scope of work. In a nutshell, the contractor must complete the contract in full conformity with the approved design and scope of work without variation order.

The Project was completed sometime in early 2008 and the contractor has demobilized from the site recently. 

Unfortunately, instead of building 179 kilometer of bituminous pavement serving as a major truck road linking the south and north of the State of Sabah, the Government has only completed only a 179 kilometer of standard gravel road wholly contrary to the Design & Build contract for a bituminous road.

Before the Design & Build contract, the existing road was already then a good gravel road built and used by timber operator for logging activities.

I also urge your ACA experts to investigate into the very sub-standard and extremely poor quality of work done and workmanship carried out in this mega project costing our Malaysians taxpayers some RM565 million. 

It is just too plain and obvious in inspecting the newly completed retaining structures and concrete roadside drains which are already now in such deplorable conditions. 

It is a crime to allow such shoddy workmanship and inferior work in this expensive project. What was the basis for the Government to accept the road as practically and satisfactorily completed?  

This is a case of an outrageous and scandalous wrongdoing. It is more than just a serious wastage and abuse of public funds. It has also deprived all Malaysians especially Sabahans in Tawau a good system of road network in furtherance of our social and economic development. 

Those who were responsible for the suffering of the people must be held accountable for this tragic loss of public funds and blatant abuse of power.  
It will be more outrageous for us, especially the ACA, to ignore it.   

Thank you for your attention and further necessary actions.
Yours faithfully,

__________________________

DATUK KONG HONG MING
My Address: Lot 21, 3rd Floor, Block C, Damai Point, Luyang, Off Jalan Damai, Kota Kinabalu
        Tel (Office) 088-233558, Fax 088-245646, Hand-phone 0138888188 
 

Raja Eleena Azlan Shah - Wanita ke-2 terkaya di Malaysia

Raja Eleena binti Sultan Azlan Shah(anak kepada Sultan Azlan Shah) mengikut survey yg dijalankan pada May 2007, Raja Eleena menduduki tangga ke25 orang terkaya di Malaysia dgn jumlah asset bernilai US$228million (MYR 773 million).Pada tahun 2008 telah turun ranking dgn menduduki tempat ke35 orang terkaya di malaysia.hebat sungguh perempuan ni kan? tak tahulah dr mana asset-asset yg sebegitu banyak diperolehi ni.kesian kat rakyat Perak ni hidup susah tapi anak sultan dah hampir bergelar BILLIONAIRE.


Raja Eleena binti Sultan Azlan Shah is a daughter of the current ruler of Perak, Sultan Azlan Shah. She was born on April 3, 1960 and holds a Bachelor’s Degree in Law from the University of London. She is now a lawyer with her own legal firm in Kuala Lumpur.

Eleena Azlan Shah is also a practicing barrister, being called by Lincoln’s Inn, London, in 1985.

Upon returning to Malaysia, she joined Messrs Skrine & Co and was called to the Malaysian Bar in 1986. She set-up her own legal practice Messrs Raja Eleena, Siew Ang & Associates in 1987 of which she is presently a senior partner.
Eleena Azlan Shah was appointed to the Board of Gamuda on 1 June 1992. She is the niece of Kamarul Zaman bin Mohd Ali. She is a Director and major shareholder of Generasi Setia (M) Sdn Bhd, which is a major shareholder of Gamuda. Her directorships in other public companies are with KAF-Seagroatt & Campbell Holdings Berhad and Danau Permai Resort Berhad.

Eleena Azlan Shah was named in May 2007 as Malaysia’s 25th richest in the country with assets worth over US$228 million (MYR 773 million). She becomes the list’s second woman after Chong Chook Yew who occupies number 18th with US$320 million (MYR 1.085 billion). Her wealth comes from her being the largest individual shareholder in construction firm Gamuda.

Eleena’s stock took a beating in the past 18 months. She was ranked number 35 richest woman in 2008.


Nota: Kalau nak tahu Gamuda la dok buat projek landasan keretapi berkembar di Perak bernilai lebih RM1 bilion. Sapa lak pengerusi projek landasan berkembar tu? Eleena lak kawan rapat Datin Seri Rosmah Mansor, isteri DS Najib. Nampak ke gambarannya?




No comments:

Post a Comment

Note: Only a member of this blog may post a comment.